Manny's Demolition & Junk Removal

Junk Removal in Dalton, GA

We cover Dalton out of Rome, about 45 miles out. Scheduled, usually within a few days.

5 from 58 Google reviews

Dalton specifically

Dalton is the carpet capital, and that industry defines the property here: mill buildings, warehouse space, and a large stock of worker housing. The town sits in the valley under Rocky Face Ridge with I-75 running its length, so the industrial side lines the corridor and the older housing sits behind it.

Flooring here is the material as much as the industry. Tear-out from one house comes off as rolled carpet, shredded pad, tack strip and a few thousand staples, and rolled carpet won't compress, stack or behave like anything else that goes on a trailer. Showrooms and outlet stores add their own version of it: sample racks, display boards, cut ends. Behind the mills sits the housing the mills built. Crown Cotton Mill put worker houses up on Factory Hill in the 1880s and kept adding to them, and much of that stock has been rental for decades now. Rental means turnover. Turnover means somebody has to empty the place between tenants.

Getting a trailer in

Two extremes about a mile apart. The warehouse and showroom side has dock doors, forklifts and room for anything you like. The old mill grid has none of that: houses close to the street, short drives, and back lots reached down an alley wide enough for one vehicle at a time. Which side of town you are on decides whether the trailer parks at the door or at the curb.

Turnaround: scheduled, usually within a few days. Rome to Dalton is about 45 miles by road.

What shapes a job in Dalton

Dalton's own trade makes the arithmetic deceptive. A house worth of flooring looks like nothing stacked against a wall, then turns into a full trailer the moment it is rolled and lifted, because carpet carries dust, adhesive and twenty years of whatever was underneath it. Renovation debris behaves the same way. One bathroom of tile and backer board weighs more than a living room of furniture, and weight is what a trailer actually runs out of before it runs out of space.

Questions from Dalton

We pulled the carpet out of the whole house. How much room does that take?

More than the empty rooms suggest. Carpet leaves in long rolls that stay long, pad tears into pieces that get everywhere, and between them they fill a trailer by volume while the tack strip and old subfloor fill it by weight. Give us the square footage and say whether the pad is coming too. Then we bring enough trailer to take the lot in one go.

We install flooring. Can tear-out from our jobs go?

Yes, and it is ordinary work here rather than an exception. Installers hit the same wall their customers do, which is that the old floor leaves the house faster than anybody can find somewhere to put it. We would rather run repeat pickups across a week of jobs than fight one enormous pile on the Friday.

How soon can you get to Dalton?

Scheduled, usually within a few days. At about 45 road miles we put Dalton on the week's schedule rather than squeezing it in.

What goes on the trailer and what doesn't

What tends to come up in Dalton

What we get called out for in Dalton follows what got built there, and when:

  • Carpet, pad and tack strip from a full tear-out
  • Showroom sample racks, display boards and cut ends
  • Rental turnover in the old mill-village stock
  • Warehouse and back-of-shop clearing off the I-75 corridor

Not on the list? Call and describe it.

Clearing something out in Dalton?

Send a photo or just tell us what's there. We'll price it before anything moves.

Free Estimate Call 706-237-1712